Analysis of electrical, pipe networks with topological characteristics and reliability evaluation.
The calculation for water networks with 24,000 nodes require 8 seconds with 2.2 GHz dual-core processor and 3 GB RAM.
Name, lastname *
Company
Phone *
Email *
Your message *
Δ